Warren Evaporation Pond

Project Location: Warren NSW 2824

Client: Warren Shire Council

Project Role: Head Contractor

Contract Type: Construction

Date of Completion: 5th June 2025

About the Project: Project work was to construct a new sewerage evaporation pond at Warrens existing facility to handle higher capacity. Works consisted of fabrication of new steel transfer structure for the purpose of valve operation to control sewerage water flow, earthworks to construct new 48,000m2 evaporation pond including 660 metres of new embankment.